This Palawan island project integrates advanced engineering services, solar system project solutions, and power engineering to deliver reliable energy, optimize costs, and boost sustainable development.
Case Details
CORE EQUIPMENT
CATL Containerized Energy Storage System (2MWh per unit) + Schneider Electric Smart Distribution Cabinet. The deployment reflects the application of advanced engineering services and professional engineering services provided by a leading engineering services company, ensuring stability and efficiency for island energy projects.
SCHEDULING ALGORITHM
AI Power Scheduling Platform based on Weather Forecasting. This smart scheduling integrates service engineering and project management services, combining construction project management solutions and engineering consulting services to maximize renewable energy use and deliver reliable power engineering solutions.
SCHEDULING OPTIMIZATION
Diesel Engine Start Frequency Reduced by 83%. This breakthrough showcases how custom engineering solutions and integrated project solutions can minimize fossil fuel dependency, while enabling more efficient solar system project integration and improving overall electrical engineering performance.
Project Details and Achievements
- Scope of Coverage: Serving 7 remote islands in the Palawan archipelago, benefiting 3,000 households and 50 tourism businesses (including resorts and diving centers), with a reliable power supply rate increased from 65% to 99.5%. The project demonstrates the role of solar engineering company expertise and quality engineering services in boosting local tourism, infrastructure, and sustainable real estate development.
- Operation Optimization: The frequency of diesel engine startups has decreased from 25 times per month to 4 times, saving approximately 180,000 USD in diesel costs annually; the energy storage system stabilizes photovoltaic fluctuations, keeping voltage within ±2% range, solving the previous issue of frequent electrical damage. This reflects the efficiency of outsourced engineering services, integrated engineering, and power engineering solutions tailored for long-term island energy security.
- Industrial Promotion: After the stabilization of power supply, the number of guesthouses on the island increased from 12 to 35, with an annual increase of 40% in tourist reception, and the per capita annual income of residents increased by approximately $1,200. This highlights how construction project management services and project development services can create scalable project solutions, enhance local economies, and provide lasting social impact.