Roof photovoltaic project (1.2MWp) of Xinh Thuan Thanh Textile and Apparel Factory in Binh Duong Province, Vietnam

The rooftop photovoltaic project of the Thanh Thuan Textile and Apparel Factory in Vietnam, fully invested by our company with USD 980,000, has a total installed capacity of 1201kWp. It was connected to the grid in August 2025, satisfying the factory's demand for green electricity and saving electricity costs. The annual CO₂ emission reduction is approximately 1140 tons.
Roof photovoltaic project (1.2MWp) of Xinh Thuan Thanh Textile and Apparel Factory in Binh Duong Province, Vietnam
Case Details
Project Overview
Xin Shuncheng Textile and Garment Factory is located in the Shenlang 3 Industrial Zone, Binh Duong Province, Vietnam. It covers an area of 25,000 square meters, employs 620 people, and has an annual export value of approximately 18 million US dollars. The factory boasts three interconnected standard workshops, with a total roof area of about 11,000 square meters.

Project Background
In the first quarter of 2025, the electricity price for industrial and commercial use in Vietnam rose to USD 0.112/kWh, resulting in an average monthly electricity bill of over USD 32,000 for the factory, with the electricity cost accounting for 13% of the total expenses. Meanwhile, EU customers require that the proportion of green electricity in the supply chain be no less than 30% from 2026 onwards. The factory has decided to install photovoltaic panels on the roofs of all three factory buildings.

investment model
We have signed a 15-year power purchase agreement, with the electricity price calculated at 78% of the grid price, and zero investment required from the factory. Our company is responsible for the full investment of approximately $980,000, and is the sole investor in this photovoltaic project.

project construction
Construction began in June 2025, utilizing a total of 2,184 JA Solar 550Wp modules, with a total installed capacity of 1,201kWp. Ten Growatt 110kW string inverters were selected. The project was completed and connected to the grid by the end of August. During the construction period, the roof was reinforced, and drilling was arranged during non-production hours.

operating data
From September 2025 to February 2026, the cumulative electricity generation over six months amounted to 724,000 kWh, with an average of 120,700 kWh per month, and a self-consumption ratio of 93%. The factory saved approximately $2,700 in electricity bills per month, with an estimated total savings of $32,000 for the entire year.

Environmental benefits
Annual CO₂ emissions reduction of approximately 1,140 tons.

Project Archives
Installed capacity: 1.2 MWp
Annual power generation: approximately 1.45 million kWh
Investor: Blue Sun Pte Ltd
Grid connection time: August 2025

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
FirstName
LastName
Email *
Message
Leave a message
FirstName
LastName
Email *
Message